Sunday, September 14, 2014

Continuing on the Trailer Repair

Most of the repairs to the trailer are finished and I think  it's about ready to roll.  I'm really writing this part after the fact so the pictures are a month old.


 This view is looking out the left side.  The wall to the right is the front of the trailer which is a closet.  The closet doors and shelves have been removed. I've already begun rebuilding the wall frame. 



                                             The same view, little different angle.


                                          Same wall from outside.  See the new 2X8 beam at the bottom.  The vertical board is the slideout wall stop.

No comments:

Post a Comment